Hong Kong Water Supply Plover Cove Part 3 Reservoir Construction

Plover Cover

Tymon Mellor: Implementation of the Plover Cove scheme was intended to be undertaken in a number of stages. The first stage captured available water resources in the New Territories and a new treatment plant at Shatin. The second stage would cover the construction of the main reservoir with subsequent stages capturing water resources within the Sai Kung peninsula. With the […]

» Read more

Hong Kong Water Supply – Shing Mun Reservoir

Slide11

Tymon Mellor: The Shing Mun Valley Scheme was implemented in two stages. The First Section established a new water supply and distribution system including the first cross harbour pipeline. The Second Section provided for the construction of the Jubilee Reservoir  with a capacity greater than the total existing storage and possibly “the highest in the British Empire” [i] along with […]

» Read more

Lin Ma Hang Mine Part 4 – Decline and Closure

1950 Drilling By Hand

Tymon Mellor: In 1938, Hong Kong Mines Ltd, under the management of Mr Laurie Nielson, established Lin Ma Hang as a modern and efficient lead mine. However, the Pacific War and occupation of Hong Kong by the Japanese resulted in the mine falling into ruin. The processing equipment was removed and the tunnels stripped of all valuable apparatus and temporary […]

» Read more

Kai Tak Part 5 – Post War Airport

Kai Tak 1950

Tymon Mellor: On the 29th August, 1945 a small armada of British naval vessels under Rear Admiral Harcourt arrived off Hong Kong, ready to re-establish British administration in the territory. The following day as HMS Swiftsure entered the harbour, three Japanese suicide boats left Lamma Island to attack. Anticipating the move, aircraft from HMS Indomitable were on hand to sink […]

» Read more