Hong Kong Water Supply Shek Pik Reservoir – Part 2 Reservoir Construction

Shek Pik

Tymon Mellor: With continued water shortages on Hong Kong Island and Kowloon, pressure was on the Shek Pik construction team to complete the reservoir as fast as possible. The situation was so bad that during a particularly bad drought in the summer of 1963, the Government hired 13 tankers to ferry water from the Pearl River to a new terminal […]

» Read more

Hong Kong Water Supply – Shek Lei Pui and Kowloon Byewash Reservoir

Kowloon Bywash

Tymon Mellor: With the growing population in both Hong Kong Island and Kowloon there was a growing demand for drinking water, the existing supplies, primarily the Tai Tam reservoirs and Kowloon Reservoir were insufficient to meet such needs. With the failure of the spring rains, water famine became a common occurrence, and a quick fix was required. Water Shortages Following […]

» Read more

Shatin Airfield 1949-1962

Tymon Mellor: Following the Second World War, in 1949 the Royal Air Force established a permanent airfield at Shatin,with a 350m long concrete runway, coordinates 05/23 and a small control tower, along with building and hangars made of corrugated steel. With the growing tension in China, during the 1950’s the British Army Air Corps operated Auster AOP.9 spotter planes from the […]

» Read more

West Rail – Part 6 Project Management

Word Image 74039 1

Tymon Mellor: The West Rail project was completed on time and below budget, this was achieved by having a strong management team, experienced construction managers, motivated contractors and efficient project process. Building a large infrastructure project within existing urban environments is not just about the engineering but it is as much about managing all the different competing requirements, in particular […]

» Read more

West Rail – Part 5 Construction – Southern Section

Word Image 73983 1

Tymon Mellor: With the approval of the environmental impact assessment in March, 1998 and endorsement of the Project Agreement in September 1998, work on the construction of West Rail could commence. The West Rail project management team had already started tendering the key construction packages and with the approval of the scheme, the initial packages were awarded allowing a ground […]

» Read more

West Rail – Part 4 Detailed Design

Word Image 73962 1

With the completion of the technical studies phase of the project in 1998, the Western Corridor Railway had been rationalized from a multimodal railway serving two China crossings and operating double stack freight, to a commuter line linking Tuen Mun to Kowloon. With Government funding in place, the new project now known as ‘West Rail’ was ready to proceed to […]

» Read more

West Rail – Part 3 Technical Studies

Word Image 73821 1

Tymon Mellor: Following the submission in November 1995 by the KCRC of a detailed feasibility study (DFS) for the Western Corridor Railway, the Government had a full proposal for the line, including an updated cost at $75 billion; more than twice the original estimate. To achieve a proposed opening in 2001, preliminary engineering and design works would need to commence […]

» Read more

The Kowloon Canton Railway (British Section) Part 4 – The Early Years (1910 to 1940)

Tymon Mellor: With the opening of the Hong Kong section of the railway on 1st October 1910 and the mainland section 12 months later, Hong Kong was now part of the expanding Chinese railway network. This would link Hong Kong to the new Chinese markets; bringing huge changes to the region and the world. Unfortunately, the world did not change […]

» Read more